Diagram 5, long overhead view; High flow rates and durations, erosion prevention/control
B.
C.
D.
E.
F.


« Previous Next »

Below: Low impact erosion prevention, high flow and turbulence flood channel/spillway, image 5 of  8.  
Topic of gallery: Referential demo gallery, green erosion prevention utilizing natural vegetation to reinforce the drainage-trenching, storm water runoff-diversion structure.
Pictured below: long overhead view of StabiliGrid slope erosion prevention units installed, before the steeply sloped channel is backfilled with top soil and vegetated.
Please remember this gallery demontrates the design/construction of this flood channel/diversion system. It will eventually be vegetated with native plants that have deep/strong root  zone developments.
long overhead view of StabiliGrid slope erosion prevention units installed, before the steeply sloped channel is backfilled with top soil and vegetated.
Please remember this gallery demontrates the design/construction of this flood channel/diversion system. It will eventually be vegetated with native plants that have deep/strong root  zone developments.